After a very very long time a New Update for FutureRoad Logistics (FRL) Beta Operating Plan is available for testing from Today! We're very sorry for the long-time wait, and very thank you for your patient and helping our work by waiting for the Updates. But, now let's take a look at the Changelog below:
Content in the Update:
B.24.04.2014A
Compatible with Update 2.4 BETA
New Shift System: 6 Hours of Work in 1 Shift.**
Improved Timetable on Line 100 to 3 Shift version on Monday-Friday and Saturday.
Improved Timetable on Line 103 to 3 Shift version on Monday-Friday and Saturday.
Improved Timetable on Line 122 to 3 Shift version on Monday-Friday, Saturday and Sunday/Holidays.
Improved Timetable on Line 123 to 3 Shift version on Monday-Friday.
Improved Timetable on Line 124 to 3 Shift version on Monday-Friday.
Improved Timetable on Line 230 to 3 Shift version on Monday-Friday, Saturday and Sunday/Holidays.
Improved Tours on Line 100, 103, 122, 123, 124, and 230 to 3 Shift Scheduling.
Travel Time optimization
Steam Workshop Updates
Bug Fixes
Note: This Update is only part of the BETA Operating Plan. This'll be updated until we're not decided to release the Update to the stable version Operating Plan.
New version number: 1.9 BETA
Build: B.23.05.1917A
ATTENTION: The latest Update 2.4 BETA (0.20.71617EA) needed for the Operating Plan (OP) to work! Without the update the game won't start, or it would crash!
You can get our Stable Operating Plan from here: >>Click Here<
You can get our Beta Operating Plan from here: >>Click Here<<
We're waiting for your ideas, wishes in comments!
Comentarios